The following sections are AI-generated from the announcement content and are provided as supplementary reader aids only.
What This Announcement Means
QMines has drilled a new hole — 26MCDD052 — and found copper sulphide mineralisation 180 metres north-northeast of the boundary of its existing Mt Chalmers resource. This is significant because it is only the second hole ever drilled in this area north of the main pit, and it has already hit visible copper minerals (chalcopyrite and pyrite) over an 11-metre section. The find suggests the Mt Chalmers copper-gold system may extend further than previously known, and potentially connects to another deposit called Botos further along the same geological corridor.
Importantly, these are visual observations only — no laboratory assay grades have been reported yet. The company has been careful to note that actual copper and gold grades are unknown until lab results come back, expected by late October 2026. The mineralisation style (stringer veins beneath massive sulphide lenses) is consistent with how the main Mt Chalmers deposit looks at depth, which is an encouraging geological sign.
Follow-up drilling is already underway to test whether this is an extension of the main lode, a separate parallel zone, or something connected to the Botos deposit. If assays confirm economic grades, this could open up a meaningful new exploration target and potentially grow the Mt Chalmers resource beyond its current 11.3 million tonne boundary.
Key Takeaways
- Drillhole 26MCDD052 intersected 11m of visually identified copper sulphides (chalcopyrite–pyrite) approximately 180m NNE beyond the existing Mt Chalmers Mineral Resource boundary.
- This is only the second hole to test the prospective area north of the main pit, and the sulphide assemblage and vein textures match the stringer mineralisation logged beneath the massive sulphide lenses at Mt Chalmers.
- No assay grades have been reported — copper, gold and other metal grades remain unknown pending laboratory results expected towards the end of October 2026.
- Three geological interpretations are being considered: a northern extension of the Mt Chalmers main lode, a separate NNE-trending ‘East Lode’, or mineralisation associated with the Botos deposit.
- Follow-up drilling is underway along the interpreted ~4km Woods Shaft–Mt Chalmers–Botos corridor to test orientation, true width and continuity.
Key Facts
HIGHLIGHTS
- New Copper Discovery 180m Beyond Resource: Drillhole 26MCDD052 intersects 11m of visually identified copper sulphides, including semi-massive chalcopyrite–pyrite mineralisation, outside the existing Mt Chalmers Resource.
- Significant Resource Growth Potential: Mineralised intercept exhibits characteristics consistent with the Mt Chalmers copper-gold system, opening an exciting new exploration target beyond the existing Resource.
- Potential for Additional Massive Sulphide Lenses: Mt Chalmers-style copper sulphide stringers highlight the potential for further discoveries in previously untested ground.
- New Intersection Sharpens Mt Chalmers–Botos Exploration: Follow-up drilling will test whether the zone represents an extension of the Mt Chalmers main lode, a separate NNE-trending mineralised zone, or mineralisation associated with Botos, opening up a significant new exploration target.
- 4km Copper-Gold Corridor Emerging: Discovery supports further exploration of the interpreted Woods Shaft–Mt Chalmers–Botos corridor1, with significant areas remaining untested.
- Drilling Underway, Assays Imminent: Follow-up drilling is underway, with assays expected in late October and further results anticipated from the expanded Mt Chalmers drilling program.
Cautionary statement
Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations. Copper, gold and other metal grades remain unknown pending laboratory assays. All reported lengths are downhole; true widths are unknown. Laboratory results are expected towards the end of October 2026.
- ASX Announcement – NEW GOLD & COPPER DRILL TARGETS DEMONSTRATE MT CHALMERS GROWTH POTENTIAL – 16 June 2026
OVERVIEW
QMines Limited (ASX:QML) has intersected an 11m downhole zone of visually identified chalcopyrite–pyrite stringer mineralisation in diamond hole 26MCDD052, approximately 180m NNE of the current Mt Chalmers Mineral Resource and outside the 2024 PFS open pit.
The intersection provides a target for testing the intervening ground and the interpreted NNE corridor2, towards Botos3. Access secured under the recently announced property acquisition agreements has enabled rapid access for drilling of this northern target area. Follow up drilling is underway, with laboratory assays expected towards the end of October 2026. Metal grades, true width and continuity remain unknown.
- ASX Announcement – NEW GOLD & COPPER DRILL TARGETS DEMONSTRATE MT CHALMERS GROWTH POTENTIAL – 16 June 2026
- ASX Announcement – STRATEGIC LAND ACQUISITIONS UNLOCK BOTOS DEPOSIT – 18 September 2026
MANAGEMENT COMMENT
QMines Exploration Manager, Tom Bartschi, said:
“This is an exciting new discovery for QMines, with copper sulphide mineralisation intersected 180m beyond the existing Mt Chalmers Resource. The geological similarities and position of this intersection raise the possibility that Mt Chalmers and Botos form part of a larger, connected mineralised system, potentially opening up a significant new exploration opportunity.
Our focus to date has been on advancing Mt Chalmers towards production, with the Definitive Feasibility Study now well underway. With recent strategic land acquisitions, we are now in a position to accelerate exploration across the broader mineralised corridor. Remarkably, 26MCDD052 is only the second hole to test this highly prospective area north of the main pit.
This discovery reinforces our belief that significant exploration potential remains at Mt Chalmers. Follow-up drilling is already underway to establish the extent and continuity of the mineralisation, with assays expected later this month. While the connection between Mt Chalmers and Botos remains to be demonstrated, we are excited by the opportunity to potentially grow the Resource well beyond its current boundaries.”
TESTING THE NORTHERN GAP
The stringer mineralisation in hole 26MCDD052 is at a similar depth to the northern edge of the Mt Chalmers Resource. The intercept lies approximately 167m below surface. From the south to the north – Woods Shaft, Mt Chalmers West Lode, and Mt Chalmers Main Lode all lie on NNE trending controls, with each lode to the NE of the other. This new intercept could lie on a new NNE controlling feature, continuing the formation of lodes stepping across to the NE of the previous. There is no significant drill testing in this new position.
The reported 11m is downhole length. The hole was drilled subparallel to the interpreted NNE lineament4. Further drilling will test the zone’s orientation and whether mineralisation continues through the intervening ground.
Beyond this gap, the interpreted corridor provides a strong basis for further exploration towards, and potentially beneath, Botos.
| Hole ID | Easting (m) | Northing (m) | RL (m AHD) | Dip (°) | Azimuth (°) | Depth (m) |
|---|---|---|---|---|---|---|
| 26MCDD052 | 260219.998 | 7421837.418 | 100.235 | -60.81 | 59.25 | 255.50 |
- ASX Announcement – NEW GOLD & COPPER DRILL TARGETS DEMONSTRATE MT CHALMERS GROWTH POTENTIAL – 16 June 2026
GEOLOGICAL INTERPRETATION & FOLLOW UP TARGETS
Chalcopyrite and pyrite occur in irregular, anastomosing stringer veins across the 192m–203m downhole interval in hole 26MCDD052. Visible chalcopyrite is most abundant in the lower 3m from 200m to 203m. A weaker, pyrite dominant interval from 198m to 200m separates the upper and lower portions of the zone. These observations describe visually identified mineral abundance however metal grades remain unknown pending laboratory assays.
The sulphide assemblage and vein textures match the stringer mineralisation logged beneath the massive sulphide lenses at Mt Chalmers. Their occurrence approximately 180m NNE beyond the current Resource, at a comparable elevation to its lower northern edge, supports investigating a possible northern extension of the known stringer system. Establishing that connection will require correlation of host rocks, alteration, stratigraphy and structural relationships across the intervening ground.
The intersection also raises the question of whether an associated massive sulphide lens occurs beyond the existing Resource. In Volcanic Hosted Massive Sulphide (VHMS) systems, stringer zones can represent hydrothermal fluid pathways beneath massive sulphide accumulations. If hole 26MCDD052 occupies a comparable footwall position, the prospective mineralised horizon stratigraphically above the stringers becomes a target for assessment. Its present-day position would depend on the orientation of the rock sequence and any structural displacement; a lens cannot be assumed to lie directly above the intersection.
Three geological interpretations are being considered for the new intersection:
- a northern extension of the Mt Chalmers main lode;
- a separate NNE-trending mineralised zone east of the main lode (“East Lode” interpretation); or
- mineralisation associated with Botos.
Each provides a target for follow-up drilling. Further holes will test the zone’s orientation, host stratigraphy and extent to distinguish between these possibilities and assess its relationship to the known deposits. The current drilling has not established a continuous connection to either Mt Chalmers or Botos at this stage.
The hole targeted the NNE structures interpreted in June 2026 as a possible control on mineralisation along the approximately 4km Woods Shaft–Mt Chalmers–Botos corridor. The intersection provides a basis for further testing along this interpretation, including the possibility of continuation towards and beneath Botos.
Follow up drilling will test the zone’s orientation, true width and continuity and help constrain its relationship to the prospective massive sulphide horizon. The reported 11m is downhole length. Neither a continuous connection to the Mt Chalmers Resource, continuation beneath Botos nor an additional massive sulphide lens has been demonstrated at this stage.
- ASX Announcement – NEW GOLD & COPPER DRILL TARGETS DEMONSTRATE MT CHALMERS GROWTH POTENTIAL – 16 June 2026
CUEQ CALCULATIONS
CuEq (%) = Cu (%) + 0.2513 × Zn (%) + 0.7951 × Au (g/t) + 0.0126 × Ag (g/t). This is the Mineral Resource formula, based on spot prices on 11 September 2026 and PFS recoveries6. CuEq is calculated for each sample and then length weighted, so recalculating from the rounded grades in the table can differ by 0.01. For example, the 2.7m interval in 26MCDD025 gives 1.29 + (0.2513 × 5.25) + (0.7951 × 4.44) + (0.0126 × 109) = 7.51% CuEq.
VISUAL OBSERVATIONS & SAMPLING
The geological log records variable chalcopyrite and pyrite abundance through the 11m stringer zone. Table 1 reports the three logged subintervals, including the weaker central section. These are visual observations; laboratory assays are pending.
| From (m) | To (m) | Interval (m) | Mineralisation style | Total sulphide (%) | Chalcopyrite (%) | Pyrite (%) |
|---|---|---|---|---|---|---|
| 192.15 | 192.5 | 0.35 | Silicified, vein stringer | 3 to 7 | 1 to 3 | 2 to 4 |
| 192.5 | 194 | 1.5 | Semi massive | 20 to 30 | 10 to 15 | 10 to 15 |
| 194 | 196.5 | 2.5 | Stringer (quartz carbonate veins) | 8 to 12 | 3 to 5 | 5 to 7 |
| 196.5 | 201.5 | 5 | Disseminated, pyrite dominant | 3 to 5 | 1 to 2 | 2 to 3 |
| 201.5 | 202.1 | 0.6 | Semi massive | 25 to 35 | 15 to 20 | 10 to 15 |
| 202.1 | 203 | 0.9 | Disseminated | 3 to 5 | 1 to 2 | 2 to 3 |
| 203 | 205.4 | 2.4 | Below the zone | Trace | Trace | Trace |
Stringer style throughout. The 198m–200m interval is pyrite dominant with minor chalcopyrite. Abundances are semiquantitative visual estimates by volume from whole-core logging. No whole-zone average or metal-grade estimate is reported.
Cautionary statement
Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations. Copper, gold and other metal grades remain unknown pending laboratory assays. All reported lengths are downhole; true widths are unknown. Laboratory results are expected towards the end of October 2026.
SAMPLING & FOLLOW UP DRILLING
Analyses will determine gold, copper, zinc, lead and silver. Laboratory results are expected towards the end of October 2026 and will be reported when received. Portable XRF was used as a qualitative field aid to the geological observations. Each metre received 20 randomised surface spot readings. These spots are not representative interval samples. No numerical pXRF concentrations or interval grades have been reported herein. Laboratory assays will determine metal concentrations.
Follow up drilling along the NNE lineament7 is underway to test orientation, true width and continuity, including toward the Mt Chalmers Resource. The new intersection focuses exploration on the gap from the pit to 26MCDD052 and the broader possibility of continuation beneath Botos. Further targets will depend on geological interpretation.
The zone is outside the current Mineral Resource and 2024 PFS open pit and is not included in the Ore Reserve underpinning the Mt Chalmers PFS. It has not been incorporated into the DFS now underway. Its position makes it a target for further drilling. Assessment of potential mining access would require assayed grade, geometry, continuity, geotechnical and engineering work.
- ASX Announcement – MT CHALMERS PFS SUPPORTS VIABLE COPPER & GOLD MINE – 30 April 2024
- ASX Announcement – NEW GOLD & COPPER DRILL TARGETS DEMONSTRATE MT CHALMERS GROWTH POTENTIAL – 16 June 2026
CORE PHOTOGRAPHS ACROSS THE LOGGED ZONE
Significant Intercepts
| Hole ID | Easting | Northing | RL (m) |
Dip (°) |
Azi (°) |
EOH (m) |
From (m) |
To (m) |
Interval (m) |
Cu (%) |
Au (g/t) |
Zn (%) |
Pb (%) |
Ag (g/t) |
Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026_GT01 | 260,171 | 7,421,333 | 130.1 | -75 | 110 | 129.9 | – | – | – | – | – | – | – | – | Not sampled (geotechnical) |
| 2026_GT02 | 260,061 | 7,421,202 | 139.5 | -70 | 185 | 140.0 | – | – | – | – | – | – | – | – | Assays pending |
| 2026_GT03 | 259,846 | 7,421,069 | 106.3 | -85 | 175 | 75.5 | 48.0 | 51.0 | 3.0 | 0.10 | 0.30 | 1.90 | 0.80 | 16 | Previously reported |
| 2026_GT04 | 259,676 | 7,421,328 | 90.5 | -65 | 15 | 60.5 | – | – | – | – | – | – | – | – | Not sampled (geotechnical) |
| 2026_GT05 | 259,857 | 7,421,514 | 136.5 | -65 | 20 | 87.1 | – | – | – | – | – | – | – | – | Not sampled (geotechnical) |
| 2026_GT06 | 259,767 | 7,421,482 | 137.1 | -90 | 0 | 45.3 | – | – | – | – | – | – | – | – | Not sampled (geotechnical) |
| 26MCRD001 | 260,003 | 7,421,420 | 128.0 | -75.1 | 240 | 8.3 | – | – | – | – | – | – | – | – | Abandoned at 8.3m; not sampled |
| 26MCRD002 | 260,013 | 7,421,420 | 125.3 | -75.1 | 240 | 211.5 | 90 | 91 | 1 | 0.43 | 0.21 | 1.28 | – | 7.3 | Previously reported |
| and | 107 | 142 | 35 | 2.88 | 0.75 | 0.02 | – | 3.3 | |||||||
| incl. | 110 | 141 | 31 | 3.22 | 0.83 | 0.02 | – | 3.6 | |||||||
| and | 146 | 150 | 4 | 0.89 | 0.21 | 0.02 | – | 2.2 | |||||||
| and | 160 | 161 | 1 | 1.01 | 0.11 | 0.01 | – | 2.1 | |||||||
| and | 178 | 179 | 1 | 0.55 | 0.06 | 0.04 | – | 0.8 | |||||||
| 26MCDD003 | 259,733 | 7,421,242 | 96.0 | -60 | 100 | 102.0 | 20.0 | 24.5 | 4.3 | 1.0 | 1.7 | 8.9 | 3.7 | 57 | Previously reported |
| and | 28.5 | 34.0 | 5.5 | 0.5 | 2.5 | 11.4 | 4.7 | 29 | |||||||
| and | 54.0 | 72.0 | 18.0 | 1.7 | 2.7 | – | – | 2 | |||||||
| incl. | 54.0 | 66.0 | 12.0 | 2.0 | 3.8 | – | – | 2 | |||||||
| incl. | 61.0 | 62.0 | 1.0 | 3.3 | 20.3 | – | – | 5 | |||||||
| 26MCRD004 | 260,073 | 7,421,292 | 125.6 | -75 | 320 | 141.6 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRD005 | 260,074 | 7,421,304 | 125.6 | -75 | 143 | 156.1 | 103 | 147 | 44.0 | 1.03 | 0.15 | 0.02 | <0.01 | 2.3 | Previously reported |
| incl. | 103 | 113 | 10.0 | 2.20 | 0.35 | 0.03 | <0.01 | 4.7 | |||||||
| incl. | 108 | 110 | 2.0 | 5.52 | 0.97 | 0.05 | <0.01 | 9.3 | |||||||
| 26MCRD006 | 260,011 | 7,421,429 | 125.5 | -70 | 10 | 213.4 | 133 | 135 | 2.0 | 0.56 | 0.09 | 0.01 | 0.01 | 0.8 | Previously reported |
| and | 138 | 170 | 32.0 | 1.99 | 0.39 | 0.02 | 0.01 | 2.6 | |||||||
| incl. | 149 | 159 | 10.0 | 3.21 | 0.39 | 0.01 | 0.01 | 3.5 | |||||||
| incl. | 152 | 159 | 7.0 | 4.18 | 0.51 | 0.01 | 0.01 | 4.3 | |||||||
| and | 163 | 170 | 7.0 | 2.14 | 1.00 | 0.01 | <0.01 | 3.1 | |||||||
| 26MCDD007 | 259,794 | 7,421,207 | 94.7 | -55 | 310 | 132.4 | 40 | 48 | 8 | 0.37 | 0.23 | 0.05 | – | 2.3 | Previously reported |
| and | 54 | 56 | 2 | 0.70 | 0.44 | 0.03 | – | 1.2 | |||||||
| and | 60 | 61 | 1 | 0.62 | 0.22 | 0.02 | – | 0.8 | |||||||
| and | 66 | 82 | 16 | 1.17 | 1.58 | 0.03 | – | 2.5 | |||||||
| incl. | 80 | 82 | 2 | 4.22 | 5.38 | 0.03 | – | 7.4 | |||||||
| and | 89 | 110 | 21 | 0.84 | 0.83 | 0.10 | – | 2.1 | |||||||
| incl. | 93 | 98 | 5 | 1.52 | 1.09 | 0.11 | – | 2.5 | |||||||
| and | 114 | 115 | 1 | 0.80 | 0.15 | 0.01 | – | 1.1 | |||||||
| 26MCDD008 | 259,903 | 7,421,098 | 102.9 | -75 | 270 | 159.5 | 56 | 81 | 25.0 | 0.19 | 2.08 | 2.56 | 1.79 | 92 | Previously reported |
| incl. | 56 | 69 | 13.0 | 0.29 | 3.51 | 3.89 | 2.99 | 119 | |||||||
| incl. | 56 | 63 | 7.0 | 0.35 | 5.79 | 5.16 | 4.40 | 147 | |||||||
| incl. | 67 | 69 | 2.0 | 0.56 | 1.52 | 5.72 | 3.20 | 219 | |||||||
| incl. | 71 | 77 | 6.0 | 0.12 | 0.82 | 1.69 | 0.72 | 114 | |||||||
| and | 88 | 94 | 6.0 | 0.03 | 0.20 | 0.48 | 0.43 | 5.6 | |||||||
| and | 120 | 122 | 2.0 | 0.02 | 0.09 | 0.83 | 0.44 | 5.9 | |||||||
| 26MCDD009 | 259,848 | 7,421,114 | 102.1 | -75 | 280 | 138.4 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD010 | 259,798 | 7,421,203 | 94.5 | -75 | 141.5 | 131.9 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD011 | 260,078 | 7,421,247 | 138.1 | -85 | 71.5 | 150.5 | 111 | 118 | 7.0 | 1.02 | 0.19 | 0.10 | 0.04 | 5.4 | Previously reported |
| and | 121 | 145 | 24.0 | 0.46 | 0.09 | 0.01 | 0.01 | 1.7 | |||||||
| 26MCDD012 | 259,914 | 7,421,087 | 104.7 | -75 | 160.1 | 164.4 | 45.0 | 50.0 | 5.0 | 0.12 | 0.99 | 1.84 | 1.09 | 55.5 | Previously reported |
| incl. | 45.0 | 47.0 | 2.0 | 0.15 | 1.91 | 1.73 | 1.06 | 117.7 | |||||||
| and | 116.6 | 134 | 17.4 | 0.11 | 0.18 | 1.55 | 0.63 | 12.7 | |||||||
| 26MCDD013 | 259,816 | 7,421,102 | 104.7 | -60 | 334 | 57.4 | 53.9 | 55.4 | 1.5 | 1.35 | 7.11 | 11.73 | 6.85 | 60.6 | Previously reported |
| 26MCDD014 | 259,704 | 7,421,311 | 92.9 | -65 | 105 | 147.1 | 86.0 | 95.0 | 9.0 | 0.69 | 0.07 | 0.01 | <0.01 | 0.5 | Previously reported |
| incl. | 94.0 | 95.0 | 1.0 | 2.45 | 0.20 | 0.01 | <0.01 | 1.0 | |||||||
| 26MCDD015 | 260,044 | 7,421,123 | 113.4 | -60 | 278 | 140.6 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD016 | 259,862 | 7,421,232 | 91.1 | -90 | 0 | 33.8 | – | – | – | – | – | – | – | – | Pontoon; abandoned at 33.8m, redrilled as 26MCDD017; not sampled |
| 26MCDD017 | 259,865 | 7,421,231 | 91.1 | -90 | 0 | 121.4 | NSI | Pontoon; previously reported | |||||||
| 26MCDD018 | 260,013 | 7,421,144 | 112.9 | -60 | 290 | 140.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC019 | 259,718 | 7,421,527 | 133.8 | -90 | 0 | 36.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC020 | 259,739 | 7,421,499 | 135.9 | -90 | 0 | 31.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC021 | 259,766 | 7,421,469 | 138.2 | -90 | 0 | 26.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC022 | 259,788 | 7,421,439 | 139.1 | -90 | 0 | 31.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD023 | 259,862 | 7,421,194 | 91.4 | -90 | 0 | 114.5 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD024 | 259,665 | 7,421,206 | 94.1 | -60 | 99 | 90.3 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD025 | 259,876 | 7,421,260 | 91.1 | -89.4 | 0 | 125.7 | 23.3 | 40.0 | 16.7 | 1.04 | 1.16 | 1.24 | 0.57 | 26 | Previously reported |
| incl. | 23.3 | 30.0 | 6.7 | 2.07 | 2.37 | 2.74 | 1.39 | 60 | |||||||
| incl. | 27.0 | 30.0 | 3.0 | 3.15 | 1.15 | 1.20 | 0.30 | 31 | |||||||
| and (Zn) | 23.3 | 26.0 | 2.7 | 1.29 | 4.44 | 5.25 | 3.04 | 109 | |||||||
| and (Zn) | 29.0 | 30.0 | 1.0 | 3.32 | 1.15 | 1.95 | 0.21 | 31 | |||||||
| and | 44.0 | 49.0 | 5.0 | 0.57 | 0.50 | 0.20 | 0.04 | 7 | |||||||
| incl. | 44.0 | 45.0 | 1.0 | 1.07 | 1.18 | 0.65 | 0.08 | 10 | |||||||
| and | 52.0 | 56.0 | 4.0 | 0.45 | 0.23 | 0.08 | 0.07 | 8 | |||||||
| and (Au) | 23.3 | 50.0 | 26.7 | 0.79 | 0.87 | 0.84 | 0.37 | 18 | |||||||
| and (Au) | 52.0 | 55.0 | 3.0 | 0.44 | 0.24 | 0.07 | 0.03 | 8 | |||||||
| and (Au) | 59.0 | 60.0 | 1.0 | 0.10 | 0.23 | 0.13 | 0.04 | 3 | |||||||
| 26MCDD026 | 259,619 | 7,421,057 | 94.2 | -60 | 270 | 153.3 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD027 | 259,898 | 7,421,238 | 91.5 | -90 | 0 | 67.7 | 42.7 | 54.0 | 11.3 | 1.32 | 0.43 | 0.36 | 0.06 | 11 | Previously reported |
| incl. | 42.7 | 51.0 | 8.3 | 1.64 | 0.51 | 0.44 | 0.07 | 13 | |||||||
| incl. | 42.7 | 46.0 | 3.3 | 2.70 | 0.59 | 0.50 | 0.06 | 16 | |||||||
| and (Au) | 42.7 | 53.0 | 10.3 | 1.38 | 0.45 | 0.38 | 0.06 | 11 | |||||||
| 26MCRC028 | 259,839 | 7,421,498 | 137.6 | -90 | 0 | 31.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD029 | 259,898 | 7,421,289 | 91.3 | -90 | 0 | 123.1 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC030 | 259,814 | 7,421,471 | 138.6 | -90 | 0 | 31.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD031 | 259,596 | 7,421,064 | 92.4 | -60 | 270 | 144.3 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC032 | 259,864 | 7,421,468 | 139.3 | -90 | 0 | 6.0 | – | – | – | – | – | – | – | – | Slag stockpile; abandoned at 6m, redrilled as 26MCRC032_RD |
| 26MCRC032_RD | 259,867 | 7,421,469 | 139.3 | -90 | 0 | 31.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC033 | 259,839 | 7,421,440 | 139.6 | -90 | 0 | 46.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC034 | 259,965 | 7,421,464 | 141.0 | -90 | 0 | 36.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC035 | 260,063 | 7,421,290 | 125.7 | -90 | 0 | 31.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC036 | 260,087 | 7,421,319 | 125.2 | -90 | 0 | 31.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC037 | 260,119 | 7,421,319 | 125.7 | -90 | 0 | 21.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC038 | 260,113 | 7,421,348 | 124.3 | -90 | 0 | 17.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC039 | 260,106 | 7,421,297 | 125.5 | -90 | 0 | 26.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC040 | 260,113 | 7,421,408 | 124.3 | -90 | 0 | 21.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC041 | 260,058 | 7,421,378 | 121.0 | -90 | 0 | 16.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC042 | 260,063 | 7,421,366 | 120.4 | -90 | 0 | 21.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD043 | 259,915 | 7,421,315 | 91.2 | -90 | 0 | 119.8 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC044 | 260,086 | 7,421,378 | 125.7 | -90 | 0 | 21.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC045 | 259,469 | 7,421,237 | 84.0 | -75 | 80.1 | 153.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD046 | 259,545 | 7,421,073 | 92.4 | -60 | 270 | 141.2 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD047 | 259,979 | 7,421,317 | 91.5 | -90 | 0 | 66.6 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD048 | 259,936 | 7,421,237 | 91.3 | -90 | 0 | 63.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD049 | 260,222 | 7,421,835 | 100.0 | -60 | 230 | 261.3 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD050 | 259,911 | 7,421,214 | 91.3 | -90 | 0 | 119.9 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD051 | 259,972 | 7,421,320 | 91.2 | -90 | 0 | 97.8 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD052 | 260,222 | 7,421,835 | 100.0 | -60 | 50 | – | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD053 | 259,936 | 7,421,208 | 91.2 | -90 | 0 | – | – | – | – | – | – | – | – | – | Pontoon; drilling in progress |
Resource & Reserve Estimates
Ore Reserve – Mt Chalmers8
| Deposit | Reserve Category | Tonnes (Mt) | Cut Off (% Cu) | Cu (%) | Au (g/t) | Zn (%) | Ag (g/t) | S (%) |
|---|---|---|---|---|---|---|---|---|
| Mt Chalmers | Proved | 5.1 | 0.3% | 0.72 | 0.58 | 0.25 | 4.70 | 5.80 |
| Mt Chalmers | Probable | 4.5 | 0.3% | 0.57 | 0.37 | 0.29 | 5.50 | 3.60 |
| Total | 9.6 | 0.3% | 0.65 | 0.48 | 0.27 | 5.20 | 4.30 |
Mineral Resource Estimate – Mt Chalmers8
| Deposit | Resource Category | Tonnes (Mt) | Cut Off (% Cu) | Cu (%) | Au (g/t) | Zn (%) | Ag (g/t) | S (%) |
|---|---|---|---|---|---|---|---|---|
| Mt Chalmers | Measured | 4.2 | 0.3% | 0.89 | 0.69 | 0.23 | 4.97 | 5.37 |
| Mt Chalmers | Indicated | 5.8 | 0.3% | 0.69 | 0.28 | 0.19 | 3.99 | 3.77 |
| Mt Chalmers | Inferred | 1.3 | 0.3% | 0.60 | 0.19 | 0.27 | 5.41 | 2.02 |
| Total | 11.3 | 0.3% | 0.75 | 0.42 | 0.23 | 4.60 | 4.30 |
Mineral Resource Estimate – Develin Creek9
| Deposit | Resource Category | Tonnes (Mt) | Cut Off (% Cu) | Cu (%) | Zn (%) | Au (g/t) | Ag (g/t) | Not in Mine Plan |
|---|---|---|---|---|---|---|---|---|
| Develin Creek | Indicated | 4.22 | 0.3% | 0.98 | 1.08 | 0.16 | 6.0 | |
| Develin Creek | Inferred | 0.48 | 0.3% | 0.61 | 0.41 | 0.10 | 3.5 | |
| Total | 4.70 | 0.3% | 0.94 | 1.00 | 0.15 | 5.7 |
Mineral Resource Estimate – Woods Shaft10
| Deposit | Resource Category | Tonnes (Mt) | Cut Off (% Cu) | Cu (%) | Au (g/t) | Zn (%) | Ag (g/t) | Not in Mine Plan |
|---|---|---|---|---|---|---|---|---|
| Woods Shaft | Inferred | 0.54 | 0.3% | 0.50 | 0.95 | – | – | |
| Total | 0.54 | 0.3% | 0.50 | 0.95 | – | – |
Mineral Resource Estimate – Mt Mackenzie11
| Deposit12 | Resource Category | Tonnes (Mt) | Cut Off (Au g/t) | Cu (%) | Au (g/t) * | Zn (%) | Ag (g/t) | Not in Mine Plan |
|---|---|---|---|---|---|---|---|---|
| Mt Mackenzie | Indicated | 3.77 | 0.4 | – | 0.99 | 7.3 | ||
| Mt Mackenzie | Inferred | 1.45 | 0.4 | – | 1.07 | 4.9 | ||
| Total | 5.22 | 0.4 | – | 1.01 | 6.7 |
*cut-off grade: 0.35 g/t Au for oxide, 0.55 g/t Au for primary.
- ASX Announcement – Mt Chalmers PFS Supports Viable Copper & Gold Mine, 30 April 2024. Rounding errors may occur.
- ASX Announcement – Develin Creek Resource Upgrade Unlocks Expansion Planning, 23 February 2026. Rounding errors may occur.
- ASX Announcement – Maiden Woods Shaft Resource, 22 November 2022. Rounding errors may occur.
- ASX Announcement – Mt Mackenzie Resource Upgrade delivers 32% Increase in Gold With70% Now in Indicated, 5 August 2025. Rounding errors may occur.
Regulatory Statements
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning QMines Limited planned exploration program and other statements that are not historical facts. When used in this document, the words such as “could,” “plan,” “expect,” “intend,” “may”, “potential,” “should,” and similar expressions are forward-looking statements. Although QMines believes that its expectations reflected in these forward- looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that further exploration will result in the estimation of a Mineral Resource.
Competent Person Statements
Exploration Results and Exploration Targets
The information in this announcement that relates to Exploration Results is based on information and supporting documentation compiled by Mr Thomas Bartschi, who accepts responsibility as the Competent Person for these Exploration Results. Mr Bartschi is a Member of the Australian Institute of Geoscientists and The Australasian Institute of Mining and Metallurgy and is a full-time employee of QMines Limited.
Mr Bartschi has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to the activity being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Bartschi has reviewed this announcement and consents to the inclusion of the matters based on his information in the form and context in which they appear.
Ore Reserve Estimate
The information in this report relating to the Open Pit Optimisation and the Ore Reserve Estimate is based on work compiled by Gary McCrae, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy. Mr McCrae is a full time employee of Minecomp Pty Ltd and has sufficient experience relevant to the style of mineralisation, the type of deposit under consideration and the work undertaken to qualify as a Competent Person under the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr McCrae has consented to the inclusion of this information in the form and context in which it appears.
Mineral Resource Estimate
The information in this report relating to Mineral Resource estimation is based on work completed by Stephen Hyland, a Competent Person and Fellow of the Australasian Institute of Mining and Metallurgy. Mr Hyland is Principal Consultant Geologist with Hyland Geological and Mining Consultants and has the required experience relevant to the style of mineralisation, the type of deposit under consideration and the work undertaken to qualify as a Competent Person under the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Hyland is also a Qualified Person under the rules of the Canadian Instrument NI 43 101. Mr Hyland has consented to the inclusion of this information in the form and context in which it appears.
Compliance Statement
With reference to previously reported Exploration results and mineral resources, the Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of Mineral Resources or Ore Reserves, that all material assumptions and technical parametres underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
About QMines
QMines Limited (ASX:QML) is a Queensland focused copper and gold development Company. The Company owns 100% of the Mt Chalmers (copper-gold) and Develin Creek (copper-zinc) deposits, located within 90km of Rockhampton in Queensland. Mt Chalmers is a high-grade historic mine that produced 1.2Mt @ 2.0% Cu, 3.6g/t Au and 19g/t Ag between 1898-1982.
Following several resource updates, the Mt Chalmers, Develin Creek and Mt Mackenzie projects now have Reserves of 9.6Mt and combined Resources of approximately 22Mt.1 QMines’ objective is to make new discoveries, commercialise existing deposits and transition the Company towards sustainable copper production.
1 ASX Announcement – Develin Creek Resource Upgrade. 23 February 2026
Projects & Ownership
| Mt Chalmers | 100% |
| Develin Creek | 100% |
| Mt Mackenzie | 100% |
QMines Limited ACN 643 312 104
Directors & Management
- Andrew Sparke
Executive Chairman - Peter Caristo
Executive Director (Technical) - Thomas Bartschi
Exploration Manager & Site Senior Executive (Competent Person) - Elissa Hansen
Non-Executive Director & Company Secretary - Richard Wittig
Development Manager
Contacts
- Address
Suite J, 34 Suakin Drive, Mosman NSW 2088 - Phone
+ 61 (2) 8915 6241 - Email
[email protected] - Website
qmines.com.au - Peter Nesvada
Investor Relations
[email protected] - Andrew Sparke
Executive Chairman
[email protected]
View Appendix — JORC Code 2012 Table 1
JORC Table – Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Sampling techniques |
|
|
| Drilling techniques |
|
|
| Drill sample recovery |
|
|
| Logging |
|
|
| Subsampling techniques and sample preparation |
|
|
| Quality of assay data and laboratory tests |
|
|
| Verification of sampling and assaying |
|
|
| Location of data points |
|
|
| Data spacing and distribution |
|
|
| Orientation of data in relation to geological structure |
|
|
| Sample security |
|
|
| Audits or reviews |
|
|
JORC Table – Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Mineral tenement and land tenure status |
|
|
| Exploration done by other parties |
|
|
| Geology |
|
|
| Drill hole Information |
|
|
| Data aggregation methods |
|
|
| Relationship between mineralisation widths and intercept lengths |
|
|
| Diagrams |
|
|
| Balanced reporting |
|
|
| Other substantive exploration data |
|
|
| Further work |
|
|
Frequently Asked Questions
The following Q&A is AI-generated from the announcement content and is provided as a supplementary reader aid only.
What did QMines actually find in drillhole 26MCDD052?
QMines intersected an 11-metre downhole zone of visually identified chalcopyrite–pyrite stringer mineralisation, approximately 180m NNE of the current Mt Chalmers Mineral Resource and outside the 2024 PFS open pit. The most concentrated sulphide was in the lower 3m of the zone (200m to 203m downhole), with semi-massive intervals showing 25–35% total sulphide and 15–20% chalcopyrite visually estimated.
Do we know the copper or gold grades from this new discovery?
No. Copper, gold and other metal grades remain unknown pending laboratory assays. The results reported are visual observations of mineral abundance only, which are not a substitute for laboratory analyses. Laboratory results are expected towards the end of October 2026.
How significant is this discovery relative to the existing Mt Chalmers resource?
The intersection lies approximately 180m NNE beyond the current Mt Chalmers Mineral Resource boundary and outside the modelled pit. It is only the second hole to test this area north of the main pit. The sulphide assemblage and vein textures match the stringer mineralisation logged beneath the massive sulphide lenses at Mt Chalmers, which supports investigating a possible northern extension of the known stringer system. However, neither a continuous connection to the Mt Chalmers Resource nor an additional massive sulphide lens has been demonstrated at this stage.
What are the three possible geological explanations for this intersection?
QMines is considering three interpretations: (1) a northern extension of the Mt Chalmers main lode; (2) a separate NNE-trending mineralised zone east of the main lode (the ‘East Lode’ interpretation); or (3) mineralisation associated with the Botos deposit. Follow-up drilling will test the zone’s orientation, host stratigraphy and extent to distinguish between these possibilities.
What is the Woods Shaft–Mt Chalmers–Botos corridor?
It is an interpreted approximately 4km copper-gold corridor. Woods Shaft, Mt Chalmers West Lode, and Mt Chalmers Main Lode all lie on NNE trending controls, with each lode to the NE of the other. The new intersection supports further exploration of this corridor, with significant areas remaining untested.
When will QMines report assay results from this hole?
Laboratory results are expected towards the end of October 2026. Follow-up drilling is already underway, with further results also anticipated from the expanded Mt Chalmers drilling program.