QMines has drilled two holes at its Mt Chalmers copper-gold project in Queensland and hit some very high-grade copper and gold. The standout result — 35 metres averaging 2.88% copper and 0.75 grams per tonne gold — is significantly better than what the company’s existing resource model predicted for that area. In simple terms, the ground is richer than the model suggested, which is a positive sign for the project’s economics.
What makes this particularly interesting is that these holes were not exploration holes designed to find new mineralisation — they were drilled specifically to collect rock samples for metallurgical testing as part of the Definitive Feasibility Study (DFS). The fact that they returned grades higher than the resource model means the DFS could benefit from an updated, potentially higher-grade resource estimate. Individual samples hit as high as 10.45% copper and 9.52 grams per tonne gold, showing the deposit has very rich pockets.
With assays still pending from seven more completed holes and a 10,000-metre multi-rig drilling campaign continuing, there is a strong pipeline of upcoming news. The company is also drilling beneath the flooded historic open pit using a barge — the first modern diamond drilling ever done directly below the existing pits — which could reveal additional depth extensions to the deposit.
Key Takeaways
- Hole 26MCRD002 returned 35m @ 2.88% Cu, 0.75g/t Au and 3.3g/t Ag from 107m, including a higher-grade core of 31m @ 3.22% Cu and 0.83g/t Au from 110m — grades higher than the current resource block model predicted.
- Individual sample assays reached up to 10.45% Cu and 9.52g/t Au, demonstrating the very high-grade nature of parts of the mineralised system.
- A second hole (26MCDD007) returned 16m @ 1.17% Cu and 1.58g/t Au from 66m, plus a further 21m @ 0.84% Cu and 0.83g/t Au from 89m.
- Assays are pending from seven further completed drill holes, with a 10,000m multi-rig drilling campaign continuing at Mt Chalmers.
- Quarter core from the mineralised intervals is already at ALS Burnie undergoing comminution and flotation testwork for the Definitive Feasibility Study.
Key Facts
Highlights
- Outstanding high-grade copper and gold intersection at Mt Chalmers with 35m @ 2.88% Cu, 0.75g/t Au and 3.3g/t Ag from 107m.
- Includes a higher-grade core of 31m @ 3.22% Cu and 0.83g/t Au from 110m.
- Exceptional individual assays of up to 10.45% Cu and 9.52g/t Au, demonstrating the locally very high-grade nature of the mineralised system.
- Importantly, copper grades in hole 26MCRD002 were higher than those represented locally in the current Mineral Resource block model.
- Second hole returned 16m @ 1.17% Cu and 1.58g/t Au from 66m including 2m @ 4.22% Cu and 5.38g/t Au (26MCDD007).
- A further broad zone returned of 21m @ 0.84% Cu and 0.83g/t Au from 89m including 5m @ 1.52% Cu and 1.09g/t Au.
- Results come from targeted DFS drilling within the existing Mineral Resource, with the new drilling to inform ongoing metallurgical testwork.
- Significant news flow ahead with assays pending from seven further drill holes and a 10,000m, multi-rig, drilling campaign continuing unabated.
Overview
QMines Limited (ASX:QML) is pleased to advise that assay results have been received for two diamond drill holes completed at its 100% owned Mt Chalmers Copper and Gold Project, located approximately 25km north-east of Rockhampton in Central Queensland.
Both drill holes were completed as part of the metallurgical and geotechnical drilling program supporting the ongoing Definitive Feasibility Study (DFS). The intercept returned in hole 26MCRD002 (35m at 2.88% Cu, 0.75g/t Au and 3.3g/t Ag from 107m including 31m at 3.22% Cu and 0.83g/t Au from 110m) are significantly higher than the average resource grade, and higher than those grades predicted by the current resource block model.
Drilling momentum continues at Mt Chalmers, where QMines has maintained continuous operations since March 2026. To date, the program has completed 24 holes totalling 2,890m, including 18 diamond and RC pre-collar holes totalling 2,351m across the deposit. More than 1,200 samples have been submitted to ALS providing a strong pipeline of upcoming assay results.
Hole 26MCDD007, collared approximately 300m to the south-west, also returned broad copper-gold mineralisation, including 16m at 1.17% Cu and 1.58g/t Au and a further 21m at 0.84% Cu and 0.83g/t Au, consistent with the modelled position of the stringer system.
Management Comment
QMines Exploration Manager, Tom Bartschi, said:
“A 35m intercept at 2.88% copper with gold and silver is an excellent result from a hole drilled primarily to provide metallurgical material for the Definitive Feasibility Study. We deliberately drilled into an existing Resource position, but the copper grade returned in 26MCRD002 is higher than that represented locally in the current block model.
That makes the result useful on two fronts. The new drilling provides additional information for the Mineral Resource update, while the same mineralised core is already at ALS Burnie undergoing comminution and flotation work required for the DFS.
Individual samples above 10% copper also demonstrate the tenor of the higher-grade parts of the stringer system. The assays indicate that visual logging may understate the proportion of copper-bearing sulphides in parts of the zone, and the mineralogy and flotation work now underway will determine the sulphide assemblage, liberation characteristics and metallurgical response.”
Drilling and Results
Hole 26MCRD002 was drilled to 211.5m as a reverse circulation pre-collar with an HQ3 diamond tail, at an azimuth of 240 degrees and dip of -75 degrees. Hole 26MCDD007 was drilled to 132.4m in PQ3 and HQ3 core, at an azimuth of 310 degrees and dip of -55 degrees. Collar details are set out in Table 1.
| Hole ID | Easting | Northing | RL (m) | Dip | Azimuth | EOH (m) | Type | Date Completed |
|---|---|---|---|---|---|---|---|---|
| 26MCRD002 | 260,013 | 7,421,420 | 125.3 | -75.1 | 240 | 211.5 | RC/HQ3 | 22 June 2026 |
| 26MCDD007 | 259,794 | 7,421,207 | 94.7 | -55.0 | 310 | 132.4 | PQ3/HQ3 | 5 July 2026 |
Significant intercepts are set out in Table 2. Intervals and are reported at a 0.30% Cu lower cut off with a maximum of 2m of internal dilution and a 1m minimum reported length. Included intervals are reported at a 1.00% Cu lower cut off. No top cuts have been applied and no metal equivalent grades are reported. All intervals are downhole lengths with holes drilled to maximise intercepts for metallurgical testing.
| Hole ID | From (m) |
To (m) |
Interval (m) |
Cu (%) |
Au (g/t) |
Ag (g/t) |
Zn (%) |
S (%) |
|---|---|---|---|---|---|---|---|---|
| 26MCRD002 | 90 | 91 | 1 | 0.43 | 0.21 | 7.3 | 1.28 | 6.1 |
| and | 107 | 142 | 35 | 2.88 | 0.75 | 3.3 | 0.02 | 5.7 |
| incl. | 110 | 141 | 31 | 3.22 | 0.83 | 3.6 | 0.02 | 6.1 |
| and | 146 | 150 | 4 | 0.89 | 0.21 | 2.2 | 0.02 | 5.2 |
| and | 160 | 161 | 1 | 1.01 | 0.11 | 2.1 | 0.01 | 4.4 |
| and | 178 | 179 | 1 | 0.55 | 0.06 | 0.8 | 0.04 | 2.0 |
| 26MCDD007 | 40 | 48 | 8 | 0.37 | 0.23 | 2.3 | 0.05 | 5.9 |
| and | 54 | 56 | 2 | 0.70 | 0.44 | 1.2 | 0.03 | 5.7 |
| and | 60 | 61 | 1 | 0.62 | 0.22 | 0.8 | 0.02 | 2.8 |
| and | 66 | 82 | 16 | 1.17 | 1.58 | 2.5 | 0.03 | 5.4 |
| incl. | 80 | 82 | 2 | 4.22 | 5.38 | 7.4 | 0.03 | 5.2 |
| and | 89 | 110 | 21 | 0.84 | 0.83 | 2.1 | 0.10 | 3.9 |
| incl. | 93 | 98 | 5 | 1.52 | 1.09 | 2.5 | 0.11 | 4.2 |
| and | 114 | 115 | 1 | 0.80 | 0.15 | 1.1 | 0.01 | 4.4 |
All intervals are downhole lengths. Grades are length weighted from primary quarter-core samples only, with all quality control samples excluded. Figures are rounded and may not sum exactly.
The highest individual sample grades returned were 10.45% Cu and 7.02g/t Au in hole 26MCRD002 and 5.12% Cu and 9.52g/t Au in hole 26MCDD007.
Interpretation
Mineralisation in both holes occurs within silicified and carbonate-altered volcanic breccia carrying chalcopyrite and pyrite as disseminations, patchy stringers and thin quartz-veinlet-hosted aggregates, with rare bornite logged in 26MCRD002. This is consistent with the interpreted stringer and feeder-zone position beneath the massive sulphide horizon and with the deposit model reported in previous announcements.
The copper tenor in the 26MCRD002 intercept is higher than the logged sulphide abundance. This indicates that the visual logging may understate the proportion of copper-bearing sulphides relative to pyrite in this zone. Rare bornite was logged in the hole, but the sulphide assemblage, mineral liberation and implications for metallurgical performance are being tested through the mineralogical and flotation work now in progress.
The holes were drilled within existing modelled mineralisation and were not designed to extend its known limits. Their significance lies in the grades returned in drill hole 26MCRD002 relative to those represented locally in the current block model, the additional drilling density they provide for the Mineral Resource update, and the delivery of material required to complete metallurgical testwork on the DFS critical path.
Metallurgical Testwork
Quarter core from the intervals reported above has been forwarded to ALS Burnie for comminution and flotation testwork under the Company’s geo-metallurgical program. The program is designed around discrete mineralogical domains and progresses through mineralogy, batch flotation and locked-cycle testing to provide recovery and concentrate quality inputs to the DFS financial model.
Next Steps
- Comminution and flotation testwork at ALS Burnie are now underway, with results expected in the coming weeks.
- Assays from seven subsequent metallurgical holes already completed to be reported as they are received and validated.
- Updated metallurgical information will be used to de-risk the processing flow-sheet and processing plant design as part of the ongoing DFS.
- Drilling at the Woods Shaft deposit expected to commence shortly where the company is seeking to grow an existing satellite deposit that lies just 800m southwest of the historic open pit.
- DFS activities continue with haste across all key workstreams, including resource and reserve definition, mine optimisation and design, metallurgical and geotechnical testwork, environmental approvals, infrastructure and process plant design.
- Barge drilling beneath the historic Mt Chalmers open pits provides an exciting new growth opportunity, with QMines set to receive its first-ever modern diamond drilling results from directly beneath the existing open pits, testing mineralisation below the current Resource and Reserve and providing the potential to demonstrate further depth extensions to the Mt Chalmers deposit.
Significant Intercepts
| Hole ID | Easting | Northing | RL (m) |
Dip (°) |
Azi (°) |
EOH (m) |
From (m) |
To (m) |
Interval (m) |
Cu (%) |
Au (g/t) |
Zn (%) |
Pb (%) |
Ag (g/t) |
Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026_GT01 | 260,171 | 7,421,333 | 130.1 | -75 | 110 | 129.9 | – | – | – | – | – | – | – | – | Not sampled (geotechnical) |
| 2026_GT02 | 260,061 | 7,421,202 | 139.5 | -70 | 185 | 140.0 | – | – | – | – | – | – | – | – | Assays pending |
| 2026_GT03 | 259,846 | 7,421,069 | 106.3 | -85 | 175 | 75.5 | 48.0 | 51.0 | 3.0 | 0.10 | 0.30 | 1.90 | 0.80 | 16 | Previously reported |
| 2026_GT04 | 259,676 | 7,421,328 | 90.5 | -65 | 15 | 60.5 | – | – | – | – | – | – | – | – | Not sampled (geotechnical) |
| 2026_GT05 | 259,857 | 7,421,514 | 136.5 | -65 | 20 | 87.1 | – | – | – | – | – | – | – | – | Not sampled (geotechnical) |
| 2026_GT06 | 259,767 | 7,421,482 | 137.1 | -90 | 0 | 45.3 | – | – | – | – | – | – | – | – | Not sampled (geotechnical) |
| 26MCRD001 | 260,003 | 7,421,420 | 128.0 | -75.1 | 240 | 8.3 | – | – | – | – | – | – | – | – | Abandoned at 8.3m; not sampled |
| 26MCRD002 | 260,013 | 7,421,420 | 125.3 | -75.1 | 240 | 211.5 | 90 | 91 | 1 | 0.43 | 0.21 | 1.28 | – | 7.3 | Reported herein |
| 107 | 142 | 35 | 2.88 | 0.75 | 0.02 | – | 3.3 | ||||||||
| incl. | 110 | 141 | 31 | 3.22 | 0.83 | 0.02 | – | 3.6 | |||||||
| 146 | 150 | 4 | 0.89 | 0.21 | 0.02 | – | 2.2 | ||||||||
| 160 | 161 | 1 | 1.01 | 0.11 | 0.01 | – | 2.1 | ||||||||
| 178 | 179 | 1 | 0.55 | 0.06 | 0.04 | – | 0.8 | ||||||||
| 26MCDD003 | 259,733 | 7,421,242 | 96.0 | -60 | 100 | 102.0 | 20.0 | 24.5 | 4.31 | 1.0 | 1.7 | 8.9 | 3.7 | 57 | Previously reported |
| and | 28.5 | 34.0 | 5.5 | 0.5 | 2.5 | 11.4 | 4.7 | 29 | |||||||
| and | 54.0 | 72.0 | 18.0 | 1.7 | 2.7 | – | – | 2 | |||||||
| incl. | 54.0 | 66.0 | 12.0 | 2.0 | 3.8 | – | – | 2 | |||||||
| incl. | 61.0 | 62.0 | 1.0 | 3.3 | 20.3 | – | – | 5 | |||||||
| 26MCRD004 | 260,073 | 7,421,292 | 125.6 | -75 | 320 | 141.6 | – | – | – | – | – | – | – | – | Assays Pending |
| 26MCRD005 | 260,074 | 7,421,304 | 125.6 | -75 | 143 | 156.1 | – | – | – | – | – | – | – | – | Assays Pending |
| 26MCRD006 | 260,011 | 7,421,429 | 125.5 | -70 | 10 | 213.4 | – | – | – | – | – | – | – | – | Assays Pending |
| 26MCDD007 | 259,794 | 7,421,207 | 94.7 | -55 | 310 | 132.4 | 40 | 48 | 8 | 0.37 | 0.23 | 0.05 | – | 2.3 | Reported herein |
| 54 | 56 | 2 | 0.70 | 0.44 | 0.03 | – | 1.2 | ||||||||
| 60 | 61 | 1 | 0.62 | 0.22 | 0.02 | – | 0.8 | ||||||||
| 66 | 82 | 16 | 1.17 | 1.58 | 0.03 | – | 2.5 | ||||||||
| incl. | 80 | 82 | 2 | 4.22 | 5.38 | 0.03 | – | 7.4 | |||||||
| 89 | 110 | 21 | 0.84 | 0.83 | 0.10 | – | 2.1 | ||||||||
| incl. | 93 | 98 | 5 | 1.52 | 1.09 | 0.11 | – | 2.5 | |||||||
| 114 | 115 | 1 | 0.80 | 0.15 | 0.01 | – | 1.1 | ||||||||
| 26MCDD008 | 259,903 | 7,421,098 | 102.9 | -75 | 270 | 159.5 | – | – | – | – | – | – | – | – | Assays Pending |
| 26MCDD009 | 259,848 | 7,421,114 | 102.1 | -90 | 0 | 138.4 | – | – | – | – | – | – | – | – | Assays Pending |
| 26MCDD010 | 259,798 | 7,421,203 | 94.5 | -75 | 141.5 | 131.9 | – | – | – | – | – | – | – | – | Assays Pending |
| 26MCDD011 | 260,078 | 7,421,247 | 138.1 | -85 | 71.5 | 150.5 | – | – | – | – | – | – | – | – | Assays Pending |
| 26MCDD012 | 259,914 | 7,421,087 | 104.7 | -75 | 160.1 | 164.4 | – | – | – | – | – | – | – | – | Assays Pending |
| 26MCDD013 | 259,816 | 7,421,102 | 104.7 | -60 | 334 | 57.4 | – | – | – | – | – | – | – | – | Assays Pending |
| 26MCDD014 | 259,704 | 7,421,311 | 92.9 | -65 | 105 | 147.1 | – | – | – | – | – | – | – | – | Assays Pending |
| 26MCDD015 | 260,044 | 7,421,123 | 113.4 | -60 | 278 | 140.6 | – | – | – | – | – | – | – | – | Assays Pending |
| 26MCDD016 | 259,862 | 7,421,232 | 91.1 | -90 | 0 | 33.8 | – | – | – | – | – | – | – | – | Assays Pending |
| 26MCDD017 | 259,865 | 7,421,231 | 91.1 | -90 | 0 | 121.4 | – | – | – | – | – | – | – | – | Assays Pending |
| 26MCDD018 | 260013.35 | 7421143.847 | 112.938 | -60 | 290 | 141.2 | Assays Pending |
Resource & Reserve Estimates
Ore Reserve – Mt Chalmers1
| Deposit | Reserve Category | Tonnes (Mt) | Cut Off (% Cu) | Cu (%) | Au (g/t) | Zn (%) | Ag (g/t) | S (%) |
|---|---|---|---|---|---|---|---|---|
| Mt Chalmers | Proved | 5.1 | 0.3% | 0.72 | 0.58 | 0.25 | 4.70 | 5.80 |
| Mt Chalmers | Probable | 4.5 | 0.3% | 0.57 | 0.37 | 0.29 | 5.50 | 3.60 |
| Total | 9.6 | 0.3% | 0.65 | 0.48 | 0.27 | 5.20 | 4.30 |
Mineral Resource Estimate – Mt Chalmers1
| Deposit | Resource Category | Tonnes (Mt) | Cut Off (% Cu) | Cu (%) | Au (g/t) | Zn (%) | Ag (g/t) | S (%) |
|---|---|---|---|---|---|---|---|---|
| Mt Chalmers | Measured | 4.2 | 0.3% | 0.89 | 0.69 | 0.23 | 4.97 | 5.37 |
| Mt Chalmers | Indicated | 5.8 | 0.3% | 0.69 | 0.28 | 0.19 | 3.99 | 3.77 |
| Mt Chalmers | Inferred | 1.3 | 0.3% | 0.60 | 0.19 | 0.27 | 5.41 | 2.02 |
| Total | 11.3 | 0.3% | 0.75 | 0.42 | 0.23 | 4.60 | 4.30 |
Mineral Resource Estimate – Develin Creek2
| Deposit | Resource Category | Tonnes (Mt) | Cut Off (% Cu) | Cu (%) | Zn (%) | Au (g/t) | Ag (g/t) |
|---|---|---|---|---|---|---|---|
| Develin Creek | Indicated | 4.22 | 0.3% | 0.98 | 1.08 | 0.16 | 6.0 |
| Develin Creek | Inferred | 0.48 | 0.3% | 0.61 | 0.41 | 0.10 | 3.5 |
| Total | 4.70 | 0.3% | 0.94 | 1.00 | 0.15 | 5.7 |
Mineral Resource Estimate – Woods Shaft3
| Deposit | Resource Category | Tonnes (Mt) | Cut Off (% Cu) | Cu (%) | Au (g/t) | Zn (%) | Ag (g/t) |
|---|---|---|---|---|---|---|---|
| Woods Shaft | Inferred | 0.54 | 0.3% | 0.50 | 0.95 | – | – |
| Total | 0.54 | 0.3% | 0.50 | 0.95 | – | – |
Mineral Resource Estimate – Mt Mackenzie4
| Deposit5 | Resource Category | Tonnes (Mt) | Cut Off (Au g/t) | Cu (%) | Au (g/t) * | Zn (%) | Ag (g/t) |
|---|---|---|---|---|---|---|---|
| Mt Mackenzie | Indicated | 3.77 | 0.4 | – | 0.99 | 7.3 | |
| Mt Mackenzie | Inferred | 1.45 | 0.4 | – | 1.07 | 4.9 | |
| Total | 5.22 | 0.4 | – | 1.01 | 6.7 |
*cut-off grade: 0.35 g/t Au for oxide, 0.55 g/t Au for primary.
- ASX Announcement – Mt Chalmers PFS Supports Viable Copper & Gold Mine, 30 April 2024. Rounding errors may occur.
- ASX Announcement – Develin Creek Resource Upgrade Unlocks Expansion Planning, 23 February 2026. Rounding errors may occur.
- ASX Announcement – Maiden Woods Shaft Resource, 22 November 2022. Rounding errors may occur.
- ASX Announcement – Mt Mackenzie Resource Upgrade delivers 32% Increase in Gold With70% Now in Indicated, 5 August 2025. Rounding errors may occur.
Regulatory Statements
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning QMines Limited planned exploration program and other statements that are not historical facts. When used in this document, the words such as “could,” “plan,” “expect,” “intend,” “may”, “potential,” “should,” and similar expressions are forward-looking statements. Although QMines believes that its expectations reflected in these forward- looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that further exploration will result in the estimation of a Mineral Resource.
Competent Person Statements
Exploration Results and Exploration Targets
The information in this document relating to Exploration Results and Exploration Targets has been compiled under the supervision of Tom Bartschi, a Member of the Australian Institute of Geoscientists. Mr Bartschi has sufficient experience relevant to the style of mineralisation, the type of deposit under consideration and the activities undertaken to qualify as a Competent Person under the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Bartschi has consented to the inclusion of this information in the form and context in which it appears.
Ore Reserve Estimate
The information in this report relating to the Open Pit Optimisation and the Ore Reserve Estimate is based on work compiled by Gary McCrae, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy. Mr McCrae is a full time employee of Minecomp Pty Ltd and has sufficient experience relevant to the style of mineralisation, the type of deposit under consideration and the work undertaken to qualify as a Competent Person under the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr McCrae has consented to the inclusion of this information in the form and context in which it appears.
Mineral Resource Estimate
The information in this report relating to Mineral Resource estimation is based on work completed by Stephen Hyland, a Competent Person and Fellow of the Australasian Institute of Mining and Metallurgy. Mr Hyland is Principal Consultant Geologist with Hyland Geological and Mining Consultants and has the required experience relevant to the style of mineralisation, the type of deposit under consideration and the work undertaken to qualify as a Competent Person under the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Hyland is also a Qualified Person under the rules of the Canadian Instrument NI 43 101. Mr Hyland has consented to the inclusion of this information in the form and context in which it appears.
Compliance Statement
With reference to previously reported Exploration results and mineral resources, the Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of Mineral Resources or Ore Reserves, that all material assumptions and technical parametres underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
About QMines
QMines Limited (ASX:QML) is a Queensland focused copper and gold development Company. The Company owns 100% of the Mt Chalmers (copper-gold) and Develin Creek (copper-zinc) deposits, located within 90km of Rockhampton in Queensland. Mt Chalmers is a high-grade historic mine that produced 1.2Mt @ 2.0% Cu, 3.6g/t Au and 19g/t Ag between 1898-1982.
Following several resource updates, the Mt Chalmers, Develin Creek and Mt Mackenzie projects now have Reserves of 9.6Mt and combined Resources of approximately 22Mt.1 QMines’ objective is to make new discoveries, commercialise existing deposits and transition the Company towards sustainable copper production.
1 ASX Announcement – Develin Creek Resource Upgrade. 23 February 2026
Projects & Ownership
| Mt Chalmers | 100% |
| Develin Creek | 100% |
| Mt Mackenzie | 100% |
QMines Limited ACN 643 312 104
Directors & Management
- Andrew Sparke
Executive Chairman - Peter Caristo
Executive Director (Technical) - Thomas Bartschi
Exploration Manager & Site Senior Executive (Competent Person) - Elissa Hansen
Non-Executive Director & Company Secretary - Richard Wittig
Development Manager
Contacts
- Address
Suite J, 34 Suakin Drive, Mosman NSW 2088 - Phone
+ 61 (2) 8915 6241 - Email
[email protected] - Website
qmines.com.au - Peter Nesvada
Investor Relations
[email protected] - Andrew Sparke
Executive Chairman
[email protected]
View Appendix — JORC Code 2012 Table 1
JORC TABLE — Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Sampling techniques |
|
|
| Drilling techniques |
|
|
| Drill sample recovery |
|
|
| Logging |
|
|
| Subsampling techniques and sample preparation |
|
|
| Quality of assay data and laboratory tests |
|
|
| Verification of sampling and assaying |
|
|
| Location of data points |
|
|
| Data spacing and distribution |
|
|
| Orientation of data in relation to geological structure |
|
|
| Sample security |
|
|
| Audits or reviews |
|
|
JORC TABLE — Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Mineral tenement and land tenure status |
|
|
| Exploration done by other parties |
|
|
| Geology |
|
|
| Drill hole Information |
|
|
| Data aggregation methods |
|
|
| Relationship between mineralisation widths and intercept lengths |
|
|
| Diagrams |
|
|
| Balanced reporting |
|
|
| Other substantive exploration data |
|
|
| Further work |
|
|
This announcement has been approved and authorized by the Board of QMines Limited. This announcement has been approved and authorised by the Board of QMines Limited.
Frequently Asked Questions
The following Q&A is AI-generated from the announcement content and is provided as a supplementary reader aid only.
What were the key drill results announced by QMines?
The standout result was from hole 26MCRD002, which returned 35m @ 2.88% Cu, 0.75g/t Au and 3.3g/t Ag from 107m, including a higher-grade core of 31m @ 3.22% Cu and 0.83g/t Au from 110m. A second hole, 26MCDD007, returned 16m @ 1.17% Cu and 1.58g/t Au from 66m (including 2m @ 4.22% Cu and 5.38g/t Au) and a further 21m @ 0.84% Cu and 0.83g/t Au from 89m.
Why are these results significant compared to the existing resource model?
The copper grades returned in hole 26MCRD002 were higher than those represented locally in the current Mineral Resource block model. This means the new drilling provides additional information for a Mineral Resource update and suggests the deposit may be richer in this area than previously modelled.
Were these holes drilled to find new mineralisation or for another purpose?
These holes were drilled primarily as part of the metallurgical and geotechnical drilling program supporting the ongoing Definitive Feasibility Study (DFS). They were deliberately drilled into an existing Resource position to obtain material for comminution and flotation testwork, not to extend the known limits of mineralisation.
How much drilling has QMines completed at Mt Chalmers and what is still to come?
To date, the program has completed 24 holes totalling 2,890m, including 18 diamond and RC pre-collar holes totalling 2,351m across the deposit. More than 1,200 samples have been submitted to ALS. Assays are pending from seven further drill holes, and a 10,000m multi-rig drilling campaign is continuing.
What is the next major milestone for the Mt Chalmers project?
Key next steps include comminution and flotation testwork results from ALS Burnie expected in the coming weeks, assays from seven subsequent metallurgical holes already completed, drilling at the Woods Shaft deposit expected to commence shortly, and barge drilling beneath the historic Mt Chalmers open pits to test mineralisation below the current Resource and Reserve.
What are the current Mineral Resource and Ore Reserve estimates for Mt Chalmers?
The Mt Chalmers Ore Reserve totals 9.6Mt at 0.65% Cu and 0.48g/t Au (Proved 5.1Mt and Probable 4.5Mt). The Mineral Resource totals 11.3Mt at 0.75% Cu and 0.42g/t Au (Measured 4.2Mt, Indicated 5.8Mt, Inferred 1.3Mt), all at a 0.3% Cu cut-off.