QMines has released new drill results from its Mt Chalmers copper-gold project near Rockhampton, Queensland, as part of a large 10,000-metre drilling campaign. The headline result is a 44-metre wide zone of copper mineralisation grading 1.03% copper — that’s a broad, continuous zone sitting above the project’s average resource grade, which is a positive sign for the deposit’s overall scale. Within that zone, there are higher-grade pockets including 2 metres at 5.52% copper, which is very high-grade for this style of deposit.
One drill hole (26MCDD011) had to be abandoned when the drill rods got stuck — but importantly, it was still in mineralisation when drilling stopped, meaning there is untested copper below 150.5 metres at that location. Another hole (26MCDD013) hit a thin but extremely high-grade zone containing zinc, lead, gold, silver and copper all at once, confirming the polymetallic richness of the upper part of the deposit. These results are feeding directly into the Definitive Feasibility Study (DFS), which will determine whether the project can be developed into a mine.
With 19 holes still awaiting assay results and two drill rigs still turning, QMines expects to keep releasing news regularly through to the end of the year. The next batch of results is expected from a barge-mounted drill rig operating beneath the flooded historic open pit — an area that hasn’t been drilled since 1982 and could hold significant upside.
Key Takeaways
- Hole 26MCRD005 returned a broad 44m intersection grading 1.03% Cu from 103m depth, including 2m at 5.52% Cu — above the current Mt Chalmers Mineral Resource global copper grade of 0.75% Cu.
- Hole 26MCDD011 was abandoned at 150.5m while still in mineralisation, with the final 0.5m sample returning 2.05% Cu, leaving the system untested at depth at that location.
- Hole 26MCDD013 intersected high-grade semi-massive sulphide mineralisation grading 1.5m @ 11.73% Zn, 6.85% Pb, 1.35% Cu, 7.11g/t Au and 60.6g/t Ag from 53.9m.
- Assays are pending on 19 holes for 2,314m, with two rigs continuing to drill and barge drilling results beneath the historic open pit expected next.
Key Facts
Highlights
- QMines is progressing a 10,000m multi-rig drilling campaign at Mt Chalmers, supporting the Definitive Feasibility Study (DFS) and testing extensions to the copper-gold deposit.
- 26MCRD005 intersected a broad 44m zone of copper mineralisation on the eastern side of the Mt Chalmers open pit, returning:
- 44m @ 1.03% Cu, 0.15g/t Au and 2.3g/t Ag from 103m; including
- 10m @ 2.20% Cu, 0.35g/t Au and 4.7g/t Ag from 103m; including
- 2m @ 5.52% Cu, 0.97g/t Au and 9.3g/t Ag from 108m.
- 26MCDD013 intersected high-grade semi-massive sulphide mineralisation, returning:
- 1.5m @ 11.73% Zn, 6.85% Pb, 1.35% Cu, 7.11g/t Au and 60.6g/t Ag from 53.9m.
- 26MCDD011 intersected multiple zones of copper mineralisation and was abandoned at 150.5m while still in mineralisation, returning:
- 7m @ 1.02% Cu from 111m; including
- 2m @ 2.53% Cu; and
- 24m @ 0.46% Cu from 121m; with
- The final 0.5m sample returning 2.05% Cu at the end of hole.
- 26MCDD012 intersected shallow precious and base-metal mineralisation together with a broader zinc-lead zone, returning:
- 5m @ 0.99g/t Au, 55.5g/t Ag, 1.84% Zn and 1.09% Pb from 45m; including
- 2m @ 1.91g/t Au and 118g/t Ag; and
- 17.4m @ 1.55% Zn, 0.63% Pb and 12.7g/t Ag from 116.6m.
- 26MCDD014 intersected further copper mineralisation, returning:
- 9m @ 0.69% Cu from 86m; including
- 1m @ 2.45% Cu from 94m.
- Importantly, the next results are expected from the highly anticipated barge drilling program beneath the historic Mt Chalmers open pit, an area not drilled since 1982.
- With assays pending on 19 holes for 2,314m and two rigs continuing unabated, QMines expects strong news flow through to year end.
Overview
QMines Limited (ASX:QML) (QMines or Company) is pleased to report assay results from a further six drill holes completed at its 100%-owned Mt Chalmers copper-gold project near Rockhampton, Queensland. The drilling forms part of the Company’s 10,000m multi-rig campaign supporting the Mt Chalmers Definitive Feasibility Study (DFS).
The strongest copper result was returned from hole 26MCRD005, which intersected 44m @ 1.03% Cu from 103m, including a higher-grade interval of 10m @ 2.20% Cu and 2m @ 5.52% Cu. The mineralisation comprises a broad zone of chalcopyrite stringers on the eastern side of the historic Mt Chalmers open pit.
A further 57m to the south, hole 26MCDD011 intersected multiple zones of copper mineralisation including 7m @ 1.02% Cu from 111m and 24m @ 0.46% Cu from 121m. The hole was abandoned at 150.5m after the drill rods became stuck, while still in mineralisation, with the final 0.5m sample returning 2.05% Cu. The mineralised system therefore remains untested below the end of hole at this location.
Drilling also returned high-grade polymetallic mineralisation within the upper sulphide horizons. Hole 26MCDD013 intersected semi-massive sulphide mineralisation grading 1.5m @ 11.73% Zn, 6.85% Pb, 1.35% Cu, 7.11g/t Au and 60.6g/t Ag from 53.9m, while hole 26MCDD012 returned shallow gold-silver-zinc-lead mineralisation of 5m @ 0.99g/t Au, 55.5g/t Ag, 1.84% Zn and 1.09% Pb from 45m including 2m @ 1.91g/t Au and 118g/t Ag.
Management Comment
QMines Exploration Manager, Tom Bartschi, said:
“These results continue to build confidence in the scale and continuity of the Mt Chalmers mineralised system.
The 44m intersection in 26MCRD005 is a strong result, particularly the higher-grade copper intervals within it, while 26MCDD011 is also encouraging given the hole ended in mineralisation and remains untested below 150.5m.
The high-grade zinc, lead, gold and silver mineralisation intersected in 26MCDD013 and 26MCDD012 also reinforces the polymetallic nature of the deposit and the value of the upper sulphide horizons.
This drilling was primarily designed to support the DFS geometallurgical program, so achieving these geological results while also generating fresh core for metallurgical testwork is a great outcome. The new data will now be incorporated into the geological and resource models as the DFS drilling program continues.”
Drilling & Assay Results
The 2026 drilling campaign continues to define the copper-rich stringer and upper polymetallic sulphide zones at Mt Chalmers. The strongest copper result from this batch was returned from hole 26MCRD005, while 26MCDD012 and 26MCDD013 intersected shallow gold-silver-zinc-lead mineralisation within the upper sulphide sequence.
Broad High-Grade Copper Zone
Hole 26MCRD005 was drilled on the eastern side of the open pit and intersected a broad zone of chalcopyrite-pyrite stringer mineralisation hosted within intensely silicified volcanic rocks. The hole returned:
- 44m @ 1.03% Cu, 0.15g/t Au and 2.3g/t Ag from 103m; including
- 10m @ 2.20% Cu, 0.35g/t Au and 4.7g/t Ag from 103m; including
- 2m @ 5.52% Cu, 0.97g/t Au and 9.3g/t Ag from 108m.
The 44m intercept sits above the current Mt Chalmers Mineral Resource global copper grade of 0.75% Cu and is consistent with the tenor of adjacent historical drilling on the section.
Approximately 57m to the south, hole 26MCDD011 intersected further copper mineralisation returning 7m @ 1.02% Cu from 111m, including 2m @ 2.53% Cu and 24m @ 0.46% Cu from 121m, including 1m @ 2.64% Cu. The hole was abandoned at 150.5m after the drill rods became stuck while still in mineralisation, with the final 1.5m returning 0.95% Cu, including 0.5m @ 2.05% Cu. Mineralisation below the end of hole remains untested at this position.
Further west, hole 26MCDD014 intersected chalcopyrite and pyrite stringers returning 9m @ 0.69% Cu from 86m including 1m @ 2.04% Cu from 87m and 1m @ 2.45% Cu from 94m.
Shallow High-Grade Gold-Silver-Zinc Lens
Drilling also intersected shallow high-grade polymetallic mineralisation within the upper sulphide sequence. Hole 26MCDD013 intersected a semi-massive sulphide unit from 53.9m, returning:
- 1.5m @ 11.73% Zn, 6.85% Pb, 1.35% Cu, 7.11g/t Au and 60.6g/t Ag.
The interval was logged as lithic tuff containing chalcopyrite-rich clasts with disseminated sphalerite and galena. Core recovery through the sulphide interval was poor, so the downhole thickness remains uncertain.
Nearby, 26MCDD012 returned:
- 5m @ 0.99g/t Au, 55.5g/t Ag, 1.84% Zn and 1.09% Pb from 45m; including
- 2m @ 1.91g/t Au and 118g/t Ag from 45m.
The hole also intersected a deeper zinc-lead zone of 17.4m @ 1.55% Zn, 0.63% Pb and 12.7g/t Ag from 116.6m. Core recovery through this deeper interval averaged 62%, and the grade and width should therefore be treated cautiously pending further drilling.
| Hole | From (m) |
To (m) |
Interval (m) |
Cu (%) |
Au (g/t) |
Ag (g/t) |
Zn (%) |
Pb (%) |
|---|---|---|---|---|---|---|---|---|
| 26MCRD005 | 103.0 | 147.0 | 44.0 | 1.03 | 0.15 | 2.3 | 0.02 | <0.01 |
| incl. | 103.0 | 113.0 | 10.0 | 2.20 | 0.35 | 4.7 | 0.03 | 0.01 |
| incl. | 108.0 | 110.0 | 2.0 | 5.52 | 0.97 | 9.3 | 0.05 | <0.01 |
| incl. | 116.0 | 120.0 | 4.0 | 1.31 | 0.21 | 3.3 | 0.01 | 0.01 |
| 26MCDD011 | 111.0 | 118.0 | 7.0 | 1.02 | 0.19 | 5.4 | 0.10 | 0.04 |
| incl. | 116.0 | 118.0 | 2.0 | 2.53 | 0.21 | 7.5 | 0.03 | 0.02 |
| 26MCDD011 | 121.0 | 145.0 | 24.0 | 0.46 | 0.09 | 1.7 | 0.01 | 0.01 |
| incl. | 141.0 | 142.0 | 1.0 | 2.64 | 0.20 | 5.0 | 0.01 | 0.01 |
| 26MCDD011 | 149.0 | 150.5 | 1.5 | 0.95 | 0.08 | 1.9 | 0.01 | <0.01 |
| 26MCDD012 | 45.0 | 50.0 | 5.0 | 0.12 | 0.99 | 55.5 | 1.84 | 1.09 |
| incl. | 45.0 | 47.0 | 2.0 | 0.15 | 1.91 | 118 | 1.73 | 1.06 |
| 26MCDD012 | 116.6 | 134.0 | 17.4 | 0.11 | 0.18 | 12.7 | 1.55 | 0.63 |
| 26MCDD013 | 53.9 | 55.4 | 1.5 | 1.35 | 7.11 | 60.6 | 11.73 | 6.85 |
| incl. | 54.1 | 55.4 | 1.3 | 1.55 | 8.19 | 68.0 | 13.30 | 7.86 |
| 26MCDD014 | 86.0 | 95.0 | 9.0 | 0.69 | 0.07 | 0.5 | 0.01 | <0.01 |
Significant Intercepts
| Hole ID | Easting | Northing | RL (m) |
Dip (°) |
Azi (°) |
EOH (m) |
From (m) |
To (m) |
Interval (m) |
Cu (%) |
Au (g/t) |
Zn (%) |
Pb (%) |
Ag (g/t) |
Status |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026_GT01 | 260,171 | 7,421,333 | 130.1 | −75 | 110 | 129.9 | – | – | – | – | – | – | – | – | Not sampled (geotechnical) |
| 2026_GT02 | 260,061 | 7,421,202 | 139.5 | −70 | 185 | 140.0 | – | – | – | – | – | – | – | – | Assays pending |
| 2026_GT03 | 259,846 | 7,421,069 | 106.3 | −85 | 175 | 75.5 | 48.0 | 51.0 | 3.0 | 0.10 | 0.30 | 1.90 | 0.80 | 16 | Previously reported |
| 2026_GT04 | 259,676 | 7,421,328 | 90.5 | −65 | 15 | 60.5 | – | – | – | – | – | – | – | – | Not sampled (geotechnical) |
| 2026_GT05 | 259,857 | 7,421,514 | 136.5 | −65 | 20 | 87.1 | – | – | – | – | – | – | – | – | Not sampled (geotechnical) |
| 2026_GT06 | 259,767 | 7,421,482 | 137.1 | −90 | 0 | 45.3 | – | – | – | – | – | – | – | – | Not sampled (geotechnical) |
| 26MCRD001 | 260,003 | 7,421,420 | 128.0 | −75.1 | 240 | 8.3 | – | – | – | – | – | – | – | – | Abandoned at 8.3m; not sampled |
| 26MCRD002 | 260,013 | 7,421,420 | 125.3 | −75.1 | 240 | 211.5 | 90 | 91 | 1 | 0.43 | 0.21 | 1.28 | – | 7.3 | Previously reported |
| and | 107 | 142 | 35 | 2.88 | 0.75 | 0.02 | – | 3.3 | |||||||
| incl. | 110 | 141 | 31 | 3.22 | 0.83 | 0.02 | – | 3.6 | |||||||
| and | 146 | 150 | 4 | 0.89 | 0.21 | 0.02 | – | 2.2 | |||||||
| and | 160 | 161 | 1 | 1.01 | 0.11 | 0.01 | – | 2.1 | |||||||
| and | 178 | 179 | 1 | 0.55 | 0.06 | 0.04 | – | 0.8 | |||||||
| 26MCDD003 | 259,733 | 7,421,242 | 96.0 | −60 | 100 | 102.0 | 20.0 | 24.5 | 4.3 | 1.0 | 1.7 | 8.9 | 3.7 | 57 | Previously reported |
| and | 28.5 | 34.0 | 5.5 | 0.5 | 2.5 | 11.4 | 4.7 | 29 | |||||||
| and | 54.0 | 72.0 | 18.0 | 1.7 | 2.7 | – | – | 2 | |||||||
| incl. | 54.0 | 66.0 | 12.0 | 2.0 | 3.8 | – | – | 2 | |||||||
| incl. | 61.0 | 62.0 | 1.0 | 3.3 | 20.3 | – | – | 5 | |||||||
| 26MCRD004 | 260,073 | 7,421,292 | 125.6 | −75 | 321 | 141.6 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRD005 | 260,074 | 7,421,304 | 125.6 | −75 | 143 | 156.1 | 103.0 | 147.0 | 44.0 | 1.03 | 0.15 | 0.02 | <0.01 | 2.3 | Reported herein |
| incl. | 103.0 | 113.0 | 10.0 | 2.20 | 0.35 | 0.03 | 0.01 | 4.7 | |||||||
| incl. | 108.0 | 110.0 | 2.0 | 5.52 | 0.97 | 0.05 | <0.01 | 9.3 | |||||||
| incl. | 116.0 | 120.0 | 4.0 | 1.31 | 0.21 | 0.01 | 0.01 | 3.3 | |||||||
| incl. | 134.0 | 135.0 | 1.0 | 2.30 | 0.13 | 0.01 | <0.01 | 3.4 | |||||||
| incl. | 145.0 | 146.0 | 1.0 | 3.80 | 0.24 | 0.01 | 0.01 | 4.6 | |||||||
| and | 153.3 | 156.1 | 2.8 | 0.38 | 0.05 | <0.01 | <0.01 | 0.9 | |||||||
| 26MCRD006 | 260,011 | 7,421,429 | 125.5 | −70 | 10 | 213.4 | 133 | 135 | 2.0 | 0.56 | 0.09 | 0.01 | 0.01 | 0.8 | Previously reported |
| and | 138 | 170 | 32.0 | 1.99 | 0.39 | 0.02 | 0.01 | 2.6 | |||||||
| incl. | 149 | 159 | 10.0 | 3.21 | 0.39 | 0.01 | 0.01 | 3.5 | |||||||
| incl. | 152 | 159 | 7.0 | 4.18 | 0.51 | 0.01 | 0.01 | 4.3 | |||||||
| and | 163 | 170 | 7.0 | 2.14 | 1.00 | 0.01 | <0.01 | 3.1 | |||||||
| 26MCDD007 | 259,794 | 7,421,207 | 94.7 | −55 | 310 | 132.4 | 40 | 48 | 8 | 0.37 | 0.23 | 0.05 | – | 2.3 | Previously reported |
| 54 | 56 | 2 | 0.70 | 0.44 | 0.03 | – | 1.2 | ||||||||
| 60 | 61 | 1 | 0.62 | 0.22 | 0.02 | – | 0.8 | ||||||||
| 66 | 82 | 16 | 1.17 | 1.58 | 0.03 | – | 2.5 | ||||||||
| incl. | 80 | 82 | 2 | 4.22 | 5.38 | 0.03 | – | 7.4 | |||||||
| 89 | 110 | 21 | 0.84 | 0.83 | 0.10 | – | 2.1 | ||||||||
| incl. | 93 | 98 | 5 | 1.52 | 1.09 | 0.11 | – | 2.5 | |||||||
| 114 | 115 | 1 | 0.80 | 0.15 | 0.01 | – | 1.1 | ||||||||
| 26MCDD008 | 259,903 | 7,421,098 | 102.9 | −75 | 270 | 159.5 | 56 | 81 | 25.0 | 0.19 | 2.08 | 2.56 | 1.79 | 92 | Previously reported |
| incl. | 56 | 69 | 13.0 | 0.29 | 3.51 | 3.89 | 2.99 | 119 | |||||||
| incl. | 56 | 63 | 7.0 | 0.35 | 5.79 | 5.16 | 4.40 | 147 | |||||||
| incl. | 67 | 69 | 2.0 | 0.56 | 1.52 | 5.72 | 3.20 | 219 | |||||||
| incl. | 71 | 77 | 6.0 | 0.12 | 0.82 | 1.69 | 0.72 | 114 | |||||||
| and | 88 | 94.0 | 6.0 | 0.03 | 0.20 | 0.48 | 0.43 | 5.6 | |||||||
| and | 120 | 122 | 2.0 | 0.02 | 0.09 | 0.83 | 0.44 | 5.9 | |||||||
| 26MCDD009 | 259,848 | 7,421,114 | 102.1 | −76 | 294 | 138.4 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD010 | 259,798 | 7,421,203 | 94.5 | −74 | 147 | 131.9 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD011 | 260,078 | 7,421,247 | 138.1 | −85 | 72 | 150.5 | 111.0 | 118.0 | 7.0 | 1.02 | 0.19 | 0.10 | 0.04 | 5.4 | Reported herein; abandoned at 150.5m |
| incl. | 116.0 | 118.0 | 2.0 | 2.53 | 0.21 | 0.03 | 0.02 | 7.5 | |||||||
| and | 121.0 | 145.0 | 24.0 | 0.46 | 0.09 | 0.01 | 0.01 | 1.7 | |||||||
| incl. | 141.0 | 142.0 | 1.0 | 2.64 | 0.20 | 0.01 | 0.01 | 5.0 | |||||||
| and | 149.0 | 150.5 | 1.5 | 0.95 | 0.08 | 0.01 | <0.01 | 1.9 | |||||||
| 26MCDD012 | 259,914 | 7,421,087 | 104.7 | −75 | 175 | 164.4 | 45.0 | 50.0 | 5.0 | 0.12 | 0.99 | 1.84 | 1.09 | 55.5 | Reported herein |
| incl. | 45.0 | 47.0 | 2.0 | 0.15 | 1.91 | 1.73 | 1.06 | 118 | |||||||
| and | 89.0 | 94.0 | 5.0 | 0.02 | 0.23 | 0.30 | 0.12 | 18.7 | |||||||
| and | 101.0 | 102.0 | 1.0 | 0.01 | 0.34 | 0.11 | 0.06 | 7.9 | |||||||
| and | 105.0 | 106.0 | 1.0 | 0.13 | 0.16 | 1.41 | 0.70 | 18.6 | |||||||
| and | 107.0 | 108.0 | 1.0 | 0.05 | 0.25 | 1.01 | 0.39 | 13.5 | |||||||
| and | 110.6 | 112.1 | 1.5 | 0.08 | 0.08 | 1.28 | 0.52 | 8.6 | |||||||
| and | 116.6 | 134.0 | 17.4 | 0.11 | 0.18 | 1.55 | 0.63 | 12.7 | |||||||
| 26MCDD013 | 259,816 | 7,421,102 | 104.7 | −60 | 334 | 57.4 | 53.9 | 55.4 | 1.5 | 1.35 | 7.11 | 11.73 | 6.85 | 60.6 | Reported herein; abandoned at 57.4m |
| incl. | 54.1 | 55.4 | 1.3 | 1.55 | 8.19 | 13.30 | 7.86 | 68.0 | |||||||
| and | 50.2 | 50.5 | 0.3 | <0.01 | 0.06 | 0.29 | 0.07 | 546 | |||||||
| 26MCDD014 | 259,704 | 7,421,311 | 92.9 | −65 | 101 | 147.1 | 81.0 | 82.0 | 1.0 | 1.12 | 0.08 | 0.02 | 0.01 | 2.7 | Reported herein |
| and | 86.0 | 95.0 | 9.0 | 0.69 | 0.07 | 0.01 | <0.01 | 0.5 | |||||||
| incl. | 87.0 | 88.0 | 1.0 | 2.04 | 0.16 | 0.01 | <0.01 | 1.9 | |||||||
| incl. | 94.0 | 95.0 | 1.0 | 2.45 | 0.20 | 0.01 | <0.01 | 1.0 | |||||||
| and | 100.0 | 101.0 | 1.0 | 0.23 | 0.06 | 0.02 | <0.01 | <0.5 | |||||||
| 26MCDD015 | 260,044 | 7,421,123 | 113.4 | −60 | 278 | 140.6 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD016 | 259,862 | 7,421,232 | 91.1 | −90 | 0 | 33.8 | – | – | – | – | – | – | – | – | Abandoned at 33.8m; not sampled |
| 26MCDD017 | 259,865 | 7,421,231 | 91.1 | −89 | 162 | 121.4 | 27.0 | 28.0 | 1.0 | 0.07 | 0.08 | 1.03 | 0.01 | 0.9 | Reported herein |
| and | 33.0 | 34.0 | 1.0 | 0.31 | 0.01 | 1.29 | 0.01 | 2.0 | |||||||
| and | 37.0 | 38.0 | 1.0 | 0.28 | 0.71 | 0.01 | 0.06 | 3.6 | |||||||
| and | 53.0 | 57.0 | 4.0 | 0.08 | 0.06 | 1.03 | 0.01 | 1.3 | |||||||
| and | 103.0 | 104.0 | 1.0 | 0.29 | 0.09 | 0.03 | <0.01 | 2.2 | |||||||
| and | 114.0 | 115.0 | 1.0 | 0.25 | 0.08 | 0.02 | <0.01 | 3.9 | |||||||
| 26MCDD018 | 260,013 | 7,421,144 | 112.9 | −60 | 300 | 141.2 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC019 | 259,718 | 7,421,527 | 133.8 | −90 | 0 | 36.0 | 1.0 | 2.0 | 1.0 | 0.06 | 0.20 | 0.11 | 0.09 | 3.5 | Reported herein; historic mine backfill |
| and | 5.0 | 7.0 | 2.0 | 0.25 | 0.29 | 0.29 | 0.12 | 9.3 | |||||||
| 26MCRC020 | 259,739 | 7,421,499 | 135.9 | −90 | 0 | 31.0 | 1.0 | 7.0 | 6.0 | 0.15 | 0.39 | 0.61 | 0.29 | 9.5 | Reported herein; historic mine backfill |
| 26MCRC021 | 259,766 | 7,421,469 | 138.2 | −90 | 0 | 26.0 | 2.0 | 7.0 | 5.0 | 0.17 | 0.28 | 0.10 | 0.07 | 3.2 | Reported herein; historic mine backfill |
| 26MCRC022 | 259,788 | 7,421,439 | 139.1 | −90 | 0 | 31.0 | 1.0 | 21.0 | 20.0 | 0.19 | 0.73 | 0.18 | 0.17 | 8.0 | Reported herein; historic mine backfill |
| incl. | 6.0 | 7.0 | 1.0 | 0.09 | 1.10 | 0.05 | 0.22 | 9.7 | |||||||
| incl. | 14.0 | 19.0 | 5.0 | 0.23 | 1.11 | 0.36 | 0.26 | 12.7 | |||||||
| 26MCDD023 | 259,862 | 7,421,194 | 91.4 | −90 | 0 | 114.5 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD024 | 259,665 | 7,421,206 | 94.1 | −60 | 109 | 90.3 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD025 | 259,876 | 7,421,260 | 91.1 | −89 | 161 | 125.7 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD026 | 259,619 | 7,421,057 | 94.2 | −60 | 270 | 153.3 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD027 | 259,898 | 7,421,238 | 91.5 | −90 | 0 | 67.7 | – | – | – | – | – | – | – | – | Abandoned at 67.7m; assays pending |
| 26MCDD029 | 259,898 | 7,421,289 | 91.3 | −90 | 0 | 123.1 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD031 | 259,596 | 7,421,064 | 92.4 | −60 | 270 | 145.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD043 | 259,915 | 7,421,315 | 91.2 | −90 | 0 | 119.8 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCRC045 | 259,469 | 7,421,237 | 84.0 | −75 | 80 | 151.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD046 | 259,545 | 7,421,073 | 92.4 | −60 | 270 | 141.2 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD047 | 259,979 | 7,421,317 | 91.5 | −90 | 0 | 66.6 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD048 | 259,936 | 7,421,237 | 91.3 | −90 | 0 | 63.0 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD049 | 260,222h | 7,421,835 | 100.0 | −60 | 230 | – | – | – | – | – | – | – | – | – | Drilling in progress |
| 26MCDD050 | 259,911 | 7,421,214 | 91.3 | −90 | 0 | 119.9 | – | – | – | – | – | – | – | – | Assays pending |
| 26MCDD051 | 259,972 | 7,421,320 | 91.2 | −90 | 0 | – | – | – | – | – | – | – | – | – | Drilling in progress |
| MB-J | 259,438 | 7,421,702 | 93.0 | −90 | 0 | 71.0 | – | – | – | – | – | – | – | – | Reported herein (water bore); not sampled |
Resource & Reserve Estimates
Ore Reserve – Mt Chalmers1
| Deposit | Reserve Category | Tonnes (Mt) | Cut Off (% Cu) | Cu (%) | Au (g/t) | Zn (%) | Ag (g/t) | S (%) |
|---|---|---|---|---|---|---|---|---|
| Mt Chalmers | Proved | 5.1 | 0.3% | 0.72 | 0.58 | 0.25 | 4.70 | 5.80 |
| Mt Chalmers | Probable | 4.5 | 0.3% | 0.57 | 0.37 | 0.29 | 5.50 | 3.60 |
| Total | 9.6 | 0.3% | 0.65 | 0.48 | 0.27 | 5.20 | 4.30 |
Mineral Resource Estimate – Mt Chalmers1
| Deposit | Resource Category | Tonnes (Mt) | Cut Off (% Cu) | Cu (%) | Au (g/t) | Zn (%) | Ag (g/t) | S (%) |
|---|---|---|---|---|---|---|---|---|
| Mt Chalmers | Measured | 4.2 | 0.3% | 0.89 | 0.69 | 0.23 | 4.97 | 5.37 |
| Mt Chalmers | Indicated | 5.8 | 0.3% | 0.69 | 0.28 | 0.19 | 3.99 | 3.77 |
| Mt Chalmers | Inferred | 1.3 | 0.3% | 0.60 | 0.19 | 0.27 | 5.41 | 2.02 |
| Total | 11.3 | 0.3% | 0.75 | 0.42 | 0.23 | 4.60 | 4.30 |
Mineral Resource Estimate – Develin Creek2
| Deposit | Resource Category | Tonnes (Mt) | Cut Off (% Cu) | Cu (%) | Zn (%) | Au (g/t) | Ag (g/t) | Not in Mine Plan |
|---|---|---|---|---|---|---|---|---|
| Develin Creek | Indicated | 4.22 | 0.3% | 0.98 | 1.08 | 0.16 | 6.0 | |
| Develin Creek | Inferred | 0.48 | 0.3% | 0.61 | 0.41 | 0.10 | 3.5 | |
| Total | 4.70 | 0.3% | 0.94 | 1.00 | 0.15 | 5.7 |
Mineral Resource Estimate – Woods Shaft3
| Deposit | Resource Category | Tonnes (Mt) | Cut Off (% Cu) | Cu (%) | Au (g/t) | Zn (%) | Ag (g/t) | Not in Mine Plan |
|---|---|---|---|---|---|---|---|---|
| Woods Shaft | Inferred | 0.54 | 0.3% | 0.50 | 0.95 | – | – | |
| Total | 0.54 | 0.3% | 0.50 | 0.95 | – | – |
Mineral Resource Estimate – Mt Mackenzie4
| Deposit5 | Resource Category | Tonnes (Mt) | Cut Off (Au g/t) | Cu (%) | Au (g/t) * | Zn (%) | Ag (g/t) | Not in Mine Plan |
|---|---|---|---|---|---|---|---|---|
| Mt Mackenzie | Indicated | 3.77 | 0.4 | – | 0.99 | 7.3 | ||
| Mt Mackenzie | Inferred | 1.45 | 0.4 | – | 1.07 | 4.9 | ||
| Total | 5.22 | 0.4 | – | 1.01 | 6.7 |
*cut-off grade: 0.35 g/t Au for oxide, 0.55 g/t Au for primary.
- ASX Announcement – Mt Chalmers PFS Supports Viable Copper & Gold Mine, 30 April 2024. Rounding errors may occur.
- ASX Announcement – Develin Creek Resource Upgrade Unlocks Expansion Planning, 23 February 2026. Rounding errors may occur.
- ASX Announcement – Maiden Woods Shaft Resource, 22 November 2022. Rounding errors may occur.
- ASX Announcement – Mt Mackenzie Resource Upgrade delivers 32% Increase in Gold With70% Now in Indicated, 5 August 2025. Rounding errors may occur.
Regulatory Statements
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning QMines Limited planned exploration program and other statements that are not historical facts. When used in this document, the words such as “could,” “plan,” “expect,” “intend,” “may”, “potential,” “should,” and similar expressions are forward-looking statements. Although QMines believes that its expectations reflected in these forward- looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that further exploration will result in the estimation of a Mineral Resource.
Competent Person Statements
Exploration Results and Exploration Targets
The information in this document relating to Exploration Results and Exploration Targets has been compiled under the supervision of Tom Bartschi, a Member of the Australian Institute of Geoscientists. Mr Bartschi has sufficient experience relevant to the style of mineralisation, the type of deposit under consideration and the activities undertaken to qualify as a Competent Person under the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Bartschi has consented to the inclusion of this information in the form and context in which it appears.
Ore Reserve Estimate
The information in this report relating to the Open Pit Optimisation and the Ore Reserve Estimate is based on work compiled by Gary McCrae, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy. Mr McCrae is a full time employee of Minecomp Pty Ltd and has sufficient experience relevant to the style of mineralisation, the type of deposit under consideration and the work undertaken to qualify as a Competent Person under the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr McCrae has consented to the inclusion of this information in the form and context in which it appears.
Mineral Resource Estimate
The information in this report relating to Mineral Resource estimation is based on work completed by Stephen Hyland, a Competent Person and Fellow of the Australasian Institute of Mining and Metallurgy. Mr Hyland is Principal Consultant Geologist with Hyland Geological and Mining Consultants and has the required experience relevant to the style of mineralisation, the type of deposit under consideration and the work undertaken to qualify as a Competent Person under the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Hyland is also a Qualified Person under the rules of the Canadian Instrument NI 43 101. Mr Hyland has consented to the inclusion of this information in the form and context in which it appears.
Compliance Statement
With reference to previously reported Exploration results and mineral resources, the Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and, in the case of estimates of Mineral Resources or Ore Reserves, that all material assumptions and technical parametres underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
About QMines
QMines Limited (ASX:QML) is a Queensland focused copper and gold development Company. The Company owns 100% of the Mt Chalmers (copper-gold) and Develin Creek (copper-zinc) deposits, located within 90km of Rockhampton in Queensland. Mt Chalmers is a high-grade historic mine that produced 1.2Mt @ 2.0% Cu, 3.6g/t Au and 19g/t Ag between 1898-1982.
Following several resource updates, the Mt Chalmers, Develin Creek and Mt Mackenzie projects now have Reserves of 9.6Mt and combined Resources of approximately 22Mt.1 QMines’ objective is to make new discoveries, commercialise existing deposits and transition the Company towards sustainable copper production.
1 ASX Announcement – Develin Creek Resource Upgrade. 23 February 2026
Projects & Ownership
| Mt Chalmers | 100% |
| Develin Creek | 100% |
| Mt Mackenzie | 100% |
QMines Limited ACN 643 312 104
Directors & Management
- Andrew Sparke
Executive Chairman - Peter Caristo
Executive Director (Technical) - Thomas Bartschi
Exploration Manager & Site Senior Executive (Competent Person) - Elissa Hansen
Non-Executive Director & Company Secretary - Richard Wittig
Development Manager
Contacts
- Address
Suite J, 34 Suakin Drive, Mosman NSW 2088 - Phone
+ 61 (2) 8915 6241 - Email
[email protected] - Website
qmines.com.au - Peter Nesvada
Investor Relations
[email protected] - Andrew Sparke
Executive Chairman
[email protected]
View Appendix — JORC Code 2012 Table 1
JORC Table — Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Sampling techniques |
|
|
| Drilling techniques |
|
|
| Drill sample recovery |
|
|
| Logging |
|
|
| Subsampling techniques and sample preparation |
|
|
| Quality of assay data and laboratory tests |
|
|
| Verification of sampling and assaying |
|
|
| Location of data points |
|
|
| Data spacing and distribution |
|
|
| Orientation of data in relation to geological structure |
|
|
| Sample security |
|
|
| Audits or reviews |
|
|
JORC Table — Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
| Criteria | JORC Code explanation | Commentary |
|---|---|---|
| Mineral tenement and land tenure status |
|
|
| Exploration done by other parties |
|
|
| Geology |
|
|
| Drill hole Information |
|
|
| Data aggregation methods |
|
|
| Relationship between mineralisation widths and intercept lengths |
|
|
| Diagrams |
|
|
| Balanced reporting |
|
|
| Other substantive exploration data |
|
|
| Further work |
|
|
Frequently Asked Questions
The following Q&A is AI-generated from the announcement content and is provided as a supplementary reader aid only.
What was the best copper result from this round of drilling?
The strongest copper result came from hole 26MCRD005, which intersected 44m @ 1.03% Cu, 0.15g/t Au and 2.3g/t Ag from 103m depth. Within that zone, the highest-grade interval was 2m @ 5.52% Cu, 0.97g/t Au and 9.3g/t Ag from 108m.
Why was hole 26MCDD011 abandoned, and does it matter?
Hole 26MCDD011 was abandoned at 150.5m after the drill rods became stuck while still in mineralisation. The final 0.5m sample returned 2.05% Cu. This means the mineralised system remains untested below the end of hole at this location, which QMines considers encouraging for further drilling.
What is the significance of the polymetallic results from 26MCDD013?
Hole 26MCDD013 intersected semi-massive sulphide mineralisation grading 1.5m @ 11.73% Zn, 6.85% Pb, 1.35% Cu, 7.11g/t Au and 60.6g/t Ag from 53.9m. This reinforces the polymetallic nature of the deposit and the value of the upper sulphide horizons, though core recovery through the sulphide interval was poor so the downhole thickness remains uncertain.
What is the purpose of this drilling campaign?
The drilling forms part of QMines’ 10,000m multi-rig campaign supporting the Mt Chalmers Definitive Feasibility Study (DFS). It was primarily designed to support the DFS geometallurgical program, generating fresh core for metallurgical testwork while also delivering geological results.
When can investors expect more results?
With assays pending on 19 holes for 2,314m and two rigs continuing unabated, QMines expects strong news flow through to year end. The next results are expected from the barge drilling program beneath the historic Mt Chalmers open pit, an area not drilled since 1982.
How do these new results compare to the existing Mt Chalmers resource grade?
The 44m intercept in 26MCRD005 grading 1.03% Cu sits above the current Mt Chalmers Mineral Resource global copper grade of 0.75% Cu and is consistent with the tenor of adjacent historical drilling on the section.